Main Content

What Should You Know About Buying a New Build With a Septic System Near San Antonio?

Quick answer: Find out what kind of system the home has, who permitted it, and who maintains it. In Texas, a new aerobic or other system that requires a maintenance contract comes with an initial two-year service policy that starts on the date the builder sells you the home. After that, you sign a new maintenance contract or, where your county allows it, maintain the system yourself.

  • The clock: under 30 TAC §285.7, the initial two-year service policy for a new single-family home starts on the date of sale by the builder.
  • Renewal: unless you maintain the system yourself, a new signed maintenance contract has to go to the permitting authority at least 30 days before the policy expires.
  • Reporting: TCEQ says a maintenance provider reports to the permitting authority at least once every four months, or every six months with electronic monitoring.

Brock Bremmer | U.S. Air Force Reserves Veteran | Real Estate Agent | eXp Realty | San Antonio Metro Area
New Construction Specialist

Also see: Who Inspects Outside City Limits | VA Minimum Property Requirements | Checking Flood Zones


When Does a New Build Have a Septic System?

If a homesite isn’t connected to a city, MUD, or other public sewer system, it needs an on-site sewage facility (OSSF), which is the state’s term for a septic system. You’ll see this more often on larger lots outside city limits in the Hill Country and rural parts of the metro. Ask the builder which one your lot has. Don’t assume from the price or the lot size.

In Texas, OSSFs are regulated by the Texas Commission on Environmental Quality (TCEQ) and usually permitted by a local authority, often the county. In unincorporated Comal County, for example, the County Engineer’s Office takes OSSF permit applications, which must include a design from a registered engineer or sanitarian.


Conventional or Aerobic: Why Does It Matter?

  • Conventional systems: TCEQ recommends pumping the septic tank every three to five years.
  • Aerobic treatment units and other systems that require maintenance contracts: these come with ongoing maintenance, testing, and reporting requirements. Aerobic systems that disinfect with chlorine need the right tablets. TCEQ says to use calcium hypochlorite tablets certified for wastewater, and never swimming pool tablets.

Ask the builder for the system type, the permit, and the approved design, which shows where the tank and the drain or spray field go. That layout affects where you can put a pool, a fence, or a shed later.


How Does the Two-Year Service Policy Work?

TCEQ’s rule at 30 TAC §285.7 sets an initial two-year service policy for systems that require maintenance contracts:

  • Start date: for a new single-family home, the two years start on the date of sale by the builder.
  • Before approval: a signed copy of the policy has to go to the permitting authority before the system is approved for use.
  • What it covers: it has to meet the rule’s minimum contract terms, including the items covered, the response time to a complaint, how often routine maintenance and testing happen, and who maintains the disinfection unit.

Get a copy of the policy at closing, and put the expiration date on your calendar.


What Happens After Two Years?

You have two paths:

  • Sign a maintenance contract: the rule says you must submit a new signed contract to the permitting authority at least 30 days before the initial policy expires. The provider must be TCEQ-licensed, and TCEQ says they inspect the system, test it, and report to the permitting authority at least once every four months, or every six months with electronic monitoring.
  • Maintain it yourself: TCEQ says that two years after installation, homeowners can maintain systems that use secondary treatment, non-standard treatment, drip irrigation, or surface application. But some local permitting authorities have stricter rules, including homeowner training or a ban on homeowner maintenance. Check with yours first.

Texas Health and Safety Code §366.0515 says the owner of a single-family home must maintain the system directly or through a maintenance contract. In a county with at least 40,000 people, an owner who maintains their own system and gets cited for a violation has 10 days to fix it or sign a maintenance contract.


What Should You Ask Before You Sign?

  1. System type: conventional, aerobic, drip, or something else.
  2. Permit and approval: who issued them, and when the system was approved for use.
  3. The service policy: who the provider is and what it covers.
  4. The layout: where the tank and field are, and what you can’t build over.
  5. Flood status: in Comal County, an OSSF permit inside the regulatory floodplain also needs a floodplain development permit.
  6. Inspection: include the system in your own inspection plan, not just the house.

My video 4 Things Every Homeowner Must Do After Buying a New Construction Home in San Antonio covers other first-year to-dos.


Frequently Asked Questions

When does the two-year septic service policy start on a new build in Texas?

Under TCEQ’s rule at 30 TAC §285.7, the initial two-year service policy for a new single-family home starts on the date of sale by the builder. A signed copy has to be filed with the permitting authority before the system is approved for use.

Can I maintain my own aerobic septic system in Texas?

Sometimes. TCEQ says homeowners can maintain certain systems two years after installation, but some local permitting authorities require training or don’t allow homeowner maintenance. Check with your county or other permitting authority first.


Looking at Homes With Septic?

Brock Bremmer with eXp Realty is a U.S. Air Force Reserves veteran with 130+ homes sold across the San Antonio metro and an eXp ICON agent (2023–24). He helps new construction buyers get the system type, permit, service policy, and lot layout in writing before they commit to a homesite.

Also see: Inspections on a New Build | Living in Spring Branch | What a Builder Warranty Covers

Sources: 30 Tex. Admin. Code §285.7; TCEQ, Maintenance of On-Site Sewage Facilities; Tex. Health & Safety Code §366.0515; Comal County Engineer’s Office, Permits (accessed November 18, 2026).

Skip to content