Quick answer: Yes. VA’s Minimum Property Requirements allow an individual water supply, but the water has to meet the local health authority’s standards (or EPA guidelines if there aren’t local ones), and a disinterested third party has to collect and test the sample. VA’s Lender Handbook says results are valid for 90 days unless the local authority says otherwise.
- Shared wells: VA requires a permanent easement and a recorded well-sharing agreement that binds future owners.
- Local oversight: Cow Creek Groundwater Conservation District covers Kendall County’s aquifers, and Trinity Glen Rose GCD, whose site tracks Bexar County drought conditions, was created in 2001 to protect the Trinity Aquifer within its district.
Brock Bremmer | U.S. Air Force Reserves Veteran | Real Estate Agent | eXp Realty | San Antonio Metro Area
VA and New Construction Specialist
Also see: VA Minimum Property Requirements | New Builds With Septic | VA Loans on Your Own Lot
Does VA Allow a Private Well on a New Build?
Yes. VA.gov says a VA-backed purchase loan can help you buy, build, or improve a home. VA’s Lender Handbook (VA Pamphlet 26-7), Chapter 12, Topic 15, says every property must have “a continuous supply of safe and potable water” for drinking, bathing, and sanitary use, plus hot water, sanitary facilities, and a safe way to dispose of sewage. A private well can meet that standard. It just adds steps that a home on a city water line doesn’t have.
On the west and north sides of the metro, many acreage lots in Kendall, Comal, Medina, and northern Bexar counties rely on wells and septic. When a builder’s community page lists “private well” or “individual water supply,” plan on VA’s well rules from the start.
What Water Testing Does VA Require?
Chapter 12, Topic 16 sets the rules for an individual water supply:
- Standard: water quality must meet the requirements of the local health authority. If the local authority has no specific rules, EPA guidelines apply.
- Who tests: a disinterested third party must collect, transport, and test the sample. That can be the local health authority, a commercial lab, a licensed sanitary engineer, or another party the health authority accepts. VA says the veteran or other interested party may never collect or transport it.
- Timing: results are valid for 90 days from the date certified unless the local authority says otherwise.
- Filters: if the home has a water filtration system, you must acknowledge in writing that the water has to be treated continuously and the system maintained, including filter changes.
On a new build, the 90-day window matters. If the well is drilled early and construction runs long, an early test can expire before closing. Ask your lender when to test so the results are still valid at closing. VA’s Handbook also says the appraiser must report accurate water supply information, and the staff appraisal reviewer must condition the Notice of Value appropriately.
Which Water Sources Need Your Signed Statement?
Topic 16 says the appraiser must comment and the veteran must acknowledge in writing when water comes from dug wells, cisterns, or holding tanks used with hauled water, a mechanical chlorinator, springs, lakes, rivers, sand-point or artesian wells, or a rainwater catchment system. That doesn’t make those homes ineligible. It means you sign off that you know how the home gets its water.
Rainwater collection shows up on some Hill Country properties. If a lot plans to use it for drinking water, raise it with your lender before you sign the builder contract.
What If Your Lot Shares a Well?
Chapter 12, Topic 18 covers wells that serve two or more homes. The shared well must supply safe water to each home at the same time, have a permanent easement for maintenance and repair, and run under a recorded well-sharing agreement that sets repair costs and binds future owners. The lender has to get and review that agreement. If a builder or seller can’t produce a recorded agreement, that can stop a VA loan.
Who Regulates Wells Around San Antonio?
Groundwater conservation districts set local well rules, and the one that applies depends on where the lot sits:
- Kendall County: Cow Creek GCD says it was created to conserve and protect groundwater from the aquifers in Kendall County. It publishes tiered well construction standards and notes that the Hill Country area was declared a critical groundwater area in 1990, now the Hill Country Priority Groundwater Management Area.
- Bexar County: Trinity Glen Rose GCD says it was created in 2001 to conserve, preserve, and protect the Trinity Aquifer within its district, and its site tracks Bexar County drought conditions. On November 22, 2026, it said the district was still in Stage 2 of its Drought Management Plan. Check whether your lot is inside its boundary.
- Medina County: the 2026 county tax list includes a Medina County Groundwater Conservation District line at $0.006094 per $100.
- Elsewhere: the Texas Water Development Board keeps a list of groundwater conservation districts statewide.
Ask the builder for the well’s state well report. The Texas Water Development Board’s Submitted Drillers Report database holds well reports filed through the state’s online system, though TWDB notes that well locations in it aren’t verified by state staff. Texas A&M AgriLife’s Texas Well Owner Network also runs well-owner trainings and water screenings.
How Do the Well and Septic Fit Together on the Lot?
VA’s Handbook says appraisers must know the minimum distances between private wells and sources of pollution, though they don’t have to sketch them. In practice, that means you want the well location, the septic tank, and the drain field drawn on the builder’s site plan before you sign. Comal County’s septic permit guide, for example, lists lots smaller than one acre served by a private well among the cases that need a professional engineer or registered sanitarian to submit the septic planning materials. Here’s more on buying a new build with septic.
My video How to Buy a New Construction Home with a VA Loan in San Antonio walks through the VA steps on a new build.
Frequently Asked Questions
Can I collect the well water sample myself for a VA loan?
No. VA’s Lender Handbook says a disinterested third party, such as the local health authority, a commercial lab, or a licensed sanitary engineer, must collect, transport, and test the sample. The veteran or other interested party may not.
How long are VA well water test results good for?
VA’s Lender Handbook says water test results are valid for 90 days from the date certified by the local health authority, unless the local authority says otherwise. On a new build, time the test so it’s still valid at closing.
Ready to Buy a Hill Country New Build With a VA Loan?
Brock Bremmer with eXp Realty is a U.S. Air Force Reserves veteran with 130+ homes sold across the San Antonio metro and an eXp ICON agent (2024). He helps VA buyers check wells, septic plans, and water testing timelines on Hill Country new builds before they sign.
- 📞 Call or text: 210-501-5088
- 📧 Email: [email protected]
- 📅 Schedule a free consultation
Also see: VA Loans on New Construction | VA Appraisal Costs | Thornebrook, Bulverde | Choosing a Bulverde New Construction Agent
Sources: VA Lender’s Handbook Ch. 12, Topic 15; VA Lender’s Handbook Ch. 12, Topic 16; VA Lender’s Handbook Ch. 12, Topic 18; VA.gov, VA-Backed Purchase Loan; EPA, Private Drinking Water Well Programs; Cow Creek Groundwater Conservation District; Trinity Glen Rose Groundwater Conservation District; Medina County, 2026 Tax Rates and Assessments; Texas Water Development Board, Groundwater Conservation Districts; Texas Water Development Board, Groundwater Data and Well Reports; Texas Well Owner Network; Comal County, Steps to Obtain an OSSF Permit (accessed November 22, 2026).